Deep stuffing
boxes. Depth is more than adequate in all sizes and pressure to assure
tightness and maximum packing life. Packing size confirm to API/BS standards
for petroleum and allied industries.
Extra clearance prevent stem scoring Sufficient
clearance between the gland & stuffing box prevents scoring of stem,
stuffing box & gland bush.
A lantern ring shall be furnished if required by
the customer.
The stem hole in the back seat bushing shall be
designed with proper clearance to guide the stem and, when the back
seat bushing supports the packing, prevent extrusion of the packing.
The stem connection to a wedge gate shall be a
"T" head that is integral (without welding) with the stem. The stem
connection shall prevent the stem from turning or disengaging from the
gate while the valve is in service.